Tangshan Glory Shovel Manufacturing Co., Ltd
+8613739886997
Contact Us
  • Tel: +86-315-4108869
  • Fax: +86-315-4118887
  • Email: admin@global-shovel.com
  • Add: Songdaokou, Luannan County, Tangshan, Hebei, China

The production process of steel shovel

Nov 05, 2021

▲First, cut the rail steel according to size (the rail steel is resistant to wear and has sufficient strength and toughness);

▲The rail steel is heated at high temperature in the furnace;

▲The red track steel is placed on the forging press and forged repeatedly. Put it into the rolling machine, and deform after rolling several times;

▲Reheat the rolled rail steel in the furnace, put the red rail steel on the forging press for forging processing, and then put it into the rolling press, and after rolling it several times, it will become a long steel plate; (note that the process needs two times. Heating forging)

▲It becomes a long steel plate after several times of rolling, and the steel plate is placed neatly after cooling;

▲The steel plate is put into the punching machine, and the steel shovel is punched out;

▲After the steel shovel is heated at high temperature, it is put into the machine for stamping and forming;

▲After the steel shovel is heated at high temperature, it is put into the machine for stamping and forming;

▲Surface treatment of steel shovel. The surface coating treatment of steel shovel is the anti-rust of the product surface decoration;

▲Packing and storage of steel shovel. The steel shovel head and the shovel shaft are packed and stored separately;